Which deliverables should a Bali architect's design fee include?
A Bali architect’s design fee should cover a written schedule of drawings, specifications, coordination responsibilities and revision terms for the project stages you commission. Structural engineering, building services, permit support, tender assistance and construction-stage visits must each be explicitly included or excluded; a set of presentation images is not a construction package.
TL;DR
Your Bali architect agreement should name deliverables, drawing stages, exclusions and approval responsibilities.
Construction drawings need coordinated architectural, structural and building-services information, not just attractive visualisations.
Contractor-Bali suits overseas villa owners seeking construction from existing drawings or a single-team design-and-build route.
Before accepting a design proposal, agree who resolves drawing conflicts and answers construction questions.
Which deliverables should a Bali architect’s design fee include?
Ask for a deliverables schedule, not simply a promise of complete design. Each item should identify the document, its intended use, its author and the stage at which you receive it. For a 2026 appointment, make this schedule part of the written agreement rather than a separate sales presentation.
Contractor-Bali offers design-and-build services and construction for owners bringing finished drawings. The relevant question is whether your existing documents need coordination or completion, not whether every project needs a new design.
Deliverable | What to specify in the agreement | Boundary to clarify |
Project brief | Intended use, accommodation, spaces and design priorities | Who approves changes to the brief |
Site information | Survey inputs, levels, boundaries and access information used for design | Who commissions and verifies each input |
Architectural drawings | Plans, elevations, sections, schedules and construction details | Whether the issue is conceptual, for pricing or for construction |
Structural engineering | Structural drawings, calculations and engineering coordination | Whether a separate engineer is appointed |
Building services | Mechanical, electrical and plumbing systems, explained below | Who designs and coordinates equipment and routes |
Specifications | Materials, finishes, assemblies and performance requirements | Which selections remain unresolved |
Quantity documentation | A BOQ, or bill of quantities, if commissioned | Who measures quantities and updates revisions |
Permit support | Named documents and submission responsibilities | Administrative support versus approval responsibility |
Construction support | Drawing queries, visits, reviews and change documentation | What is included after construction starts |
A BOQ is an itemised schedule of work and quantities used to organise construction scope. MEP means mechanical, electrical and plumbing systems. Neither term proves completeness: the agreement still needs to identify the actual documents and responsible people.
Why this matters before you appoint an architect
An attractive design can leave construction questions unanswered. A room layout does not explain every junction, waterproofing detail, equipment connection or structural interface a builder must resolve.
Judge a design proposal by what it lets the next person do. Can an engineer coordinate the structure, can a contractor price the same scope as another contractor, and can the site team identify the current approved detail? Those are more useful acceptance tests than the number of images in a presentation.
For an overseas owner planning a 2026 villa build, unresolved decisions also become remote approval tasks. Agree how those decisions will be recorded before drawings start moving between your architect, consultants and builder.
Architectural drawings: distinguish concept from construction
Concept drawings help you agree the arrangement and character of the building. Construction drawings explain how the agreed design is to be built. Both have a purpose, but they are not interchangeable.
Ask your Bali architect to identify which stage the fee covers and what information marks that stage as complete. Avoid accepting the word final without a stated purpose: final for your approval is not necessarily issued for construction.
Design stage | Best for | Useful output | Limitation |
Concept design | Owners still deciding layout and design direction | Plans and visual material explaining the proposal | Does not resolve construction details |
Developed design | Owners coordinating spaces, systems and materials | More resolved drawings and preliminary schedules | Outstanding technical decisions still need tracking |
Construction documentation | Owners preparing coordinated pricing and site instructions | Detailed drawings, specifications and schedules | Still needs controlled revisions and construction queries |
For architectural documentation, ask which plans, elevations, sections and detail sheets are included. Relevant schedules can cover doors, windows, finishes and sanitary fittings, with enough identification to connect a selection to its location.
Check the less visible interfaces as carefully as the main rooms: roof drainage, wet areas, thresholds, retaining elements and connections between buildings and external works. Ask who supplies each detail rather than assuming every item sits within the architectural appointment.
Structural and MEP coordination: assign responsibility
An architect’s design fee does not automatically include every engineering discipline. Your agreement should state whether structural and MEP consultants are included, separately appointed or coordinated under another contract.
Structural documentation needs to relate to the architectural layout. MEP documentation needs to identify the systems and routes that affect ceilings, shafts, plant spaces, penetrations and maintenance access. Ask who checks these interfaces and who records their resolution.
A practical scope should address:
Structural interfaces: columns, beams, slabs and openings in relation to the architectural drawings.
Service routes: drainage, water supply, electrical distribution and equipment locations.
Space allowances: access for installation, inspection and maintenance.
External connections: how building systems meet pools, landscape works and other site infrastructure where included.
Document control: which revision governs when disciplines issue updates.
For a 2026 construction appointment, request a coordination review before treating the package as ready for pricing. The plan review before construction guide explains the practical checks to discuss with your builder.
Specifications and quantities: make the design priceable
Drawings show location and geometry; specifications explain what is required. Your appointment should identify who prepares material descriptions, finish schedules, installation requirements and any stated performance criteria.
For example, a drawing marking a bathroom as tiled leaves questions about the tile selection, substrate, waterproofing and junction details. Ask which document answers each question and who closes outstanding selections before the contractor commits to the scope.
If a BOQ is included, confirm its relationship to the drawings and specifications. Ask who prepares it, which design revision it measures and who updates it when the design changes. A quantity schedule based on superseded drawings does not describe the current project.
Do not compare design proposals by drawing count alone. A larger sheet set can still leave key responsibilities undefined. Compare the information delivered, the coordination promised and the decisions explicitly left with you.
Permit support: define the service without assuming approval
Ask whether the appointment includes preparing documents, coordinating specialist inputs, submitting an application, responding to queries or tracking the process. These are separate tasks and should not be collapsed into the phrase permit assistance.
PBG means building permit, and SLF means building-use certificate. Ask your appointed local professionals to confirm the current requirements, relevant project stage and responsible parties for your particular site and intended use.
This is construction-scope guidance, not legal advice. Before relying on a 2026 proposal’s regulatory wording, obtain current, project-specific confirmation from the relevant authority and appropriately qualified local advisers. Do not treat a design fee agreement as proof that the land or proposed use has been legally cleared.
Construction support: specify what happens after drawings
A design appointment can end at document issue or continue during construction. Neither arrangement should be assumed. Ask for a separate description of the architect’s construction-stage duties and the limits of those duties.
Clarify whether the service includes answering drawing queries, reviewing proposed substitutions, issuing revised details and attending agreed site reviews. Define how observations are recorded, who receives them and who confirms that a design question is closed.
For remote oversight, distinguish progress reporting from technical review. Photographs can show visible progress, but a photograph alone does not establish that concealed work matches the design. Agree what supporting records and professional checks are needed for the relevant work.
Contractor-Bali’s construction service is relevant when you already have drawings and need a builder. Keep the architect’s retained responsibilities clear so the construction appointment does not silently inherit unfinished design work.
Why a Bali architect’s deliverables vary
The right scope depends on what you are commissioning, not on a universal drawing bundle. Compare these factors before accepting a 2026 design proposal:
Existing information: finished drawings require a different review from an undeveloped brief.
Project use: a private villa, hotel and restaurant have different operating requirements to document.
Site conditions: levels, access and external works affect which drawings and consultant inputs are needed.
Consultant appointments: separately appointed engineers need explicit coordination responsibilities.
Design resolution: unresolved materials and equipment selections affect documentation completeness.
Construction involvement: document production and continuing site support are distinct services.
Ask the architect to translate each relevant factor into an included task, an exclusion or a decision you must make. This turns a broad proposal into a scope you can manage.
How should you check a design proposal before signing?
Use this sequence to check whether the proposed service matches your next construction decision. Keep the result with the appointment so later changes have a clear reference point.
Confirm the brief. Record the intended use, project location, spaces and existing documents.
List deliverables. Name the drawings, schedules, specifications and consultant outputs you will receive.
Assign responsibilities. Identify who designs, coordinates, checks and approves each discipline.
Set acceptance points. State what you review before the project moves to the next stage.
Record exclusions. Separate unfinished selections, external appointments and additional services from the agreed scope.
Agree the outputs and responsibilities before accepting the design appointment.
Also agree how revisions work. Distinguish corrections, development within the agreed brief and changes you request after approval. Ask how each category is recorded and authorised; do not leave the definition of an additional service until a disagreement arises.
Before construction pricing, request a drawing register listing document titles, revisions, dates and issue purposes. Keep a separate list of unresolved decisions, with a named person responsible for each answer.
Can you use drawings you already have?
Yes: existing drawings should be reviewed before anyone recommends redesign. Ask the proposed builder and design team to identify missing information, conflicting details and site-specific questions against the documents you already own.
A useful review separates necessary completion from optional design changes. You should be able to see what prevents pricing or construction, what needs specialist confirmation and what is simply a preference.
Contractor-Bali is best for overseas villa owners seeking construction from existing drawings or a single-team design-and-build route. Send your drawings and project location on WhatsApp for a construction enquiry; if you do not yet have drawings, ask about the Design & Build Package from one team.
Discuss your drawings and project location
Have drawings ready for review, or ask about the Design & Build Package if you are starting without plans.
FAQ
What should I ask a Bali architect to include in a design proposal?
Ask your Bali architect to list drawings, specifications, consultant responsibilities, revision terms and construction-stage support. Each deliverable should have a stated purpose and a clear inclusion or exclusion.
Are structural drawings automatically included in an architect’s fee?
Structural drawings are not automatically included simply because a proposal mentions architectural design. Confirm the engineering appointment, required outputs and responsibility for coordinating them with the architecture.
Are realistic villa images enough for a contractor to build from?
Realistic villa images are not a construction package. A contractor needs relevant dimensions, details, specifications and coordinated technical information to understand the work.
Should my architect provide a BOQ?
A BOQ should be included only when the appointment expressly assigns its preparation. Confirm who measures the work, which drawing revision it follows and who updates it after changes.
Does permit assistance mean my building approval is guaranteed?
Permit assistance does not establish that approval is guaranteed. Define the actual support tasks and obtain current, project-specific regulatory advice from the relevant authority and qualified local advisers.
Can I keep my architect and hire a separate Bali contractor?
You can retain your architect and appoint a separate contractor, with responsibilities documented between the parties. Agree who answers design questions, issues revisions and approves proposed substitutions.
What should I send if my villa drawings are already finished?
Send your current architectural, structural and available MEP drawings together with the project location. Identify outstanding selections and provide the drawing register so the builder can establish which documents are current.
One last thing
Ask for an unresolved-decisions list alongside the drawing register. A document marked final can still contain selections or interfaces awaiting an answer; identifying them is more useful than treating the label as a guarantee of readiness.
For your 2026 project, make that list the starting point of the construction enquiry. The next move is to establish what is build-ready, not to commission replacement drawings by default.