How should a Bali architect prepare drawings for a PBG application?
A Bali architect should prepare a coordinated, revision-controlled drawing package that describes the proposed building consistently across architectural, structural and building-services information. For a 2026 PBG (building permit) application, confirm the applicable submission requirements with the responsible local professionals before issuing the package; a construction checklist does not replace that confirmation.
TL;DR
A Bali architect should resolve drawing conflicts before issuing a PBG application package.
Confirm submission requirements separately from construction drawing completeness.
Keep existing architectural plans when suitable; identify specific gaps rather than assume a redesign.
Contractor-bali offers villa construction and complete design-and-build services for overseas owners.
How should a Bali architect prepare drawings for a PBG application?
Use the following sequence to organise the drawings, coordinate the consultants and control the issue. Treat it as a practical preparation process, not an official schedule of mandatory submission documents. For the separate construction-readiness check, see how a Bali contractor reviews plans before construction.
1. Confirm the submission brief
Ask the professional managing the application to identify the applicable submission requirements for the actual site, building use and proposed development. Record who prepares each document, who checks it and who handles questions during the application process. Resolve these responsibilities before assembling files.
Describe the project accurately: a private villa, a hotel and a development containing several buildings need different design briefs. Do not assume a drawing package prepared for another property can be reused unchanged. The project description should match the drawings being submitted.
Keep legal and regulatory questions with appropriately qualified advisers. This article addresses drawing coordination and construction preparation, not land rights, development entitlement or legal permission to build.
2. Establish the site basis
Give every consultant the same agreed site information. Ask the architect to identify the source of boundary information, survey levels, access information and the building's proposed position. Mark unresolved site information clearly rather than allowing an assumption to look confirmed.
The site layout should explain how the building, pool, external works and services relate to one another wherever those elements form part of the project. A villa footprint alone does not explain how water leaves the site or how maintenance access works.
Before the 2026 drawing issue, check that the site information used by the architect matches the information used by the structural and services designers. Differences belong on an issue list with a named person responsible for resolving them.
3. Coordinate the architecture
Check that floor plans, elevations, sections and relevant details describe the same building. Compare room layouts, openings, stairs, roof geometry and floor levels across the sheets. A change on a plan needs a corresponding check elsewhere.
Sections deserve particular attention because they explain vertical relationships that a floor plan cannot show. Ask the architect to make changes in level, roof drainage and connections between internal and external areas understandable. Do not accept an attractive rendering as a substitute for a dimensioned drawing.
For owners with finished plans, request a gap review rather than an automatic redesign. Separate missing information from actual design changes, and ask which unresolved items affect the application package and which affect later construction detailing.
4. Coordinate structure and services
Ask the structural designer to check the structural arrangement against the architectural layout. Columns, beams, slabs, stairs and significant openings should agree with the intended spaces. Flag conflicts before the drawings are issued, not after a contractor has priced incompatible information.
MEP means mechanical, electrical and plumbing systems. Coordinate the relevant service routes, equipment locations, drainage arrangements and penetrations with the architectural and structural drawings. A route shown through a structural element needs review by the responsible designers.
Pool equipment, water storage and external drainage also need coordination when included in the project. Assign responsibility for these interfaces explicitly; leaving an element outside the architect's appointment does not make its connection to the villa disappear.
5. Resolve comments and control revisions
Create a drawing register listing each sheet, its title, revision, date and issue purpose. Use the same register when sending files to the application coordinator, owner and construction team. Clearly separate current drawings from superseded copies.
Keep a comment log with an owner and resolution for each outstanding point. An email saying that the drawings have been updated is not enough: identify the changed sheets and the decisions behind them.
Before release, ask each responsible designer to confirm their own information and the interfaces they have checked. Do not label a package approved unless the relevant approval has actually been received.
6. Separate the application issue from the construction issue
Label the intended use of each drawing issue clearly. A package assembled for an application should not automatically become the instruction to build. Ask the architect and builder what further details, specifications or coordinated information are needed for construction.
Use a BOQ (bill of quantities) to connect the defined construction scope with measurable work items. Record exclusions and unresolved selections alongside it. This helps you distinguish a complete construction proposal from a quotation based on assumptions.
If application comments change the design, carry those changes through the affected drawings and construction documents. Keep the owner, architect, engineers and builder working from the same current issue.
The preparation sequence is straightforward: confirm the brief, coordinate the design, resolve comments and issue controlled documents. These are separate tasks, even when one team manages the project.
Confirm the brief before coordinating the drawings, then control the issued revisions.
Why this matters
For an overseas owner, the immediate risk is making decisions from drawings that do not agree. If the architecture shows one layout and the structural package shows another, you cannot assess the proposal clearly. The same problem carries into contractor quotations and site instructions.
Submission readiness and construction readiness are different checks. Ask what each drawing issue is intended to achieve, rather than treating the presence of a permit application package as evidence that every construction detail is resolved.
For a 2026 villa project, keep a written list of open decisions alongside the drawings. You should be able to see which questions concern the submission, which affect the construction scope and which remain owner selections.
Why PBG drawing preparation varies
The preparation work depends on the actual project and the condition of its existing information. Use these factors to brief the architect, not to predict an approval outcome:
Drawing completeness: Finished architectural plans still need checking against the structural and services information. Missing details call for a defined additional scope, not an unexplained redesign.
Site information: Boundaries, levels, access and drainage affect how the proposed building relates to its plot. Unresolved information should remain visible on the coordination list.
Building use: Explain whether the proposal is a villa, hotel, resort or commercial building. Ask the application professional to confirm requirements for that specific use.
Connected elements: Pools, retaining structures, landscaping and external services introduce interfaces. Identify which consultant owns each connection.
Consultant responsibilities: Separate architectural, engineering and application-coordination tasks. Confirm the responsibility for each deliverable in writing.
Design changes: Changes to the layout, levels or structure require a coordinated response. Avoid updating one drawing while leaving the related sheets unchanged.
Do not translate these factors into a promised application duration. First establish the scope, the responsible professionals and the status of the documents.
Should you use existing drawings or a complete design-and-build service?
Keep suitable existing work. If you already have architectural and structural drawings, ask for a coordinated review that identifies what is usable, incomplete or inconsistent. A new design is not the default answer.
If you have land and a brief but no drawings, a complete design-and-build route brings design and construction into one service arrangement. You still need clear deliverables, review responsibilities and written approval of changes.
Route | Best for | Advantage | Limitation to address |
Build from existing drawings | Owners with plans ready for review | Retains the existing design as the starting point | Consultant interfaces and missing details still need resolution |
Complete design and build | Owners without drawings who want one team | Connects design development with construction planning | The appointment must define design deliverables and owner decisions |
Contractor-bali is best suited to overseas owners seeking villa construction from existing drawings or a complete design-and-build service. The relevant starting point is your project information, not an assumption that every owner needs new architecture.
For a 2026 appointment, ask Contractor-bali to distinguish drawing-review work, any additional design scope and the construction scope. The company's villa construction service does not remove the need to confirm who handles the application and its supporting documents.
What should an overseas owner check before drawings are issued?
Ask for a short issue summary, not just a folder of files. It should identify the current drawing register, resolved comments, outstanding decisions and intended use of the package. That gives you a clear basis for authorising the next step remotely.
Your review should focus on decisions you control:
Does the layout reflect the accommodation and facilities you requested?
Are pools, landscaping and external works included or excluded clearly?
Have changes since your previous review been identified?
Is responsibility assigned for outstanding technical questions?
Does the quotation refer to the same drawing revision?
Do not try to replace the engineer's technical review with an owner's visual inspection. Your role is to confirm the brief, authorise decisions and check that the appointed professionals have addressed their responsibilities.
Keep design comments separate from instructions to the site team. A discussion about moving a wall is not a construction instruction until the design implications have been checked and the change has been formally issued.
Can your builder review drawings before the PBG application?
Yes. A builder can contribute a buildability review while the architect and engineers retain responsibility for their design information. Ask the builder to identify construction access concerns, unclear details, sequencing questions and gaps that prevent a defined quotation.
A buildability review is not permit approval. Contractor comments should return to the responsible designer for assessment, rather than becoming unrecorded changes to the application package.
For a qualified construction enquiry, send your architectural and structural drawings, project location and a brief description of the intended building on WhatsApp. Include the current drawing register if you have one. If you do not yet have drawings, ask Contractor-bali about the Design & Build Package from one team.
Use the contact page to arrange the enquiry and explain whether you need construction from existing plans or a complete design-and-build service.
FAQ
What should I ask a Bali architect to prepare for a PBG application?
Ask a Bali architect to confirm the applicable submission brief and coordinate the architectural information with the relevant structural and services documents. Request a drawing register and a clear record of unresolved items before issue.
Can I use villa drawings prepared by my existing architect?
Yes, existing villa drawings can be the starting point for a coordination and gap review. Ask the responsible local professionals to confirm what needs adaptation or additional information for the actual project and application.
Are PBG application drawings enough for a contractor to build from?
Do not assume PBG application drawings are a complete construction package. Ask the architect and contractor to identify any further details, specifications and coordinated information needed before construction instructions are issued.
Who should confirm PBG requirements for my Bali project in 2026?
The qualified professional responsible for your application should confirm the applicable 2026 requirements for your specific site and building. Construction guidance is not legal advice or confirmation of development permission.
What is the difference between PBG and SLF?
PBG refers to the building permit, while SLF refers to the building-use certificate. Ask your appointed adviser to explain the applicable processes and responsibilities for your project rather than treating them as interchangeable documents.
What should I send a builder if my villa drawings are ready?
Send the current architectural and structural drawings, project location and intended scope. Include available services information, the drawing register and any known unresolved decisions so the builder can identify review and quotation gaps.
One last thing
Before you authorise an issue, ask one question: Which exact drawing revision will every consultant and the builder receive? A coordinated package loses its value when different people work from different versions. Keep the register attached to the issue, not buried in a separate email thread.